Level 22 and 23

Size: 2000m2

 

Scope:

APS Built managed this complex project which included the fitout of level 22 and total refurbishment of level 23. This was achieved all while the client remained in occupation. To achieve this meant intense programming and staging. APS Built needed to fitout level 22 to allow the relocation of staff to new offices. This then opened up the areas to cut in two new structural steel timber lined floating stair cases.

 

The challenges included completing this whole project whilst the client remained and operated on the floors. This was achieved by full height hoarding throughout the floor to create building work zones. Install structural steel and cutting out concrete floors after hours. This meant a high level of communication with site management and the clients representative allowing for the relocation of staff during the refurbishment of level 23.

 

Finished included Canadian Rock maple Veneer joinery throughout, 890m2 of feature Banjo Pine ceilings. Bespoke Rock Maple handrail with LED and glass balustrade.

© APSBuilt 

516 Brighton Road, Brighton, South Australia, 5048

|

|

Sales Ph: 0424 127 497

|

  • Black Facebook Icon