25 Grenfell Street, Level 5

Size: 1000m2

 

Scope:

APS Built were engaged to make good an existing tired building floor and create an Industrial finish New York Style finish.

 

Works included polish concrete floors, exposed ceiling slab and services.

© APSBuilt 

4/364 Brighton Road, Hove, South Australia, 5048

|

|

Sales Ph: (08) 8376 5444

|

  • Black Facebook Icon